Carry out a fire-safety walkthrough
A fire-safety walkthrough (Brandschutzbegehung) checks a whole building — escape routes, doors, fire barriers, signage, organisation and more. Unlike a device inspection it does not belong to a single device and has a form of its own.
Prerequisites
- Your account includes the Brandschutzbegehung feature.
- Only the owner and team members marked as fire safety officer (Brandschutzbeauftragter) may carry out a walkthrough. The owner sets this mark under Team Members in the menu of the member's entry (Mark as fire safety officer).
If a prerequisite is missing, the Walkthroughs tab shows a note instead of the Start walkthrough button.
Start a walkthrough
- In the building: tab Walkthroughs → Start walkthrough.
- From a task: for a task of the category Walkthrough, Start walkthrough opens the form. Completing the walkthrough completes the task.
- Via New Inspection: choose the category Fire safety walkthrough, the property and the building, then the button to the walkthrough form (Open walkthrough form).
You find a started draft in the Walkthroughs tab under "Walkthroughs of this building" (entry "Draft") — tap it and carry on.
Master data
- Occasion (Anlass) — e.g. regular walkthrough, extraordinary walkthrough, initial survey, follow-up walkthrough.
- Building type (Gebäudeart) — choose it first: only then does the app load the checkpoints.
- Participants — name and function of each person taking part.
- Validity period (Gültigkeitszeitraum) — 12 or 6 months. 1 month (monthly walkthrough) appears only if this option is enabled for your account.
Why the building type matters
The standard checklist has 68 checkpoints in sections 1–10 that apply to every building. Section 11 "Spezielle Bereiche" (special areas) adds points only for certain building types — e.g. warehouse / logistics, catering, place of assembly, care / health, school / daycare or underground car park / multi-storey car park.
If you change the building type later, the app asks first whenever something would be lost: answers from section 11 that do not fit the new type are removed. Defects linked to one of these checkpoints only lose that link — the defects themselves are kept. Cancel leaves everything as it was.
Administrators can adapt the checkpoints per property (see Manage Objekte). New walkthroughs in that property's buildings then use this list.
Answer the checkpoints
Each checkpoint has four answers:
- i.O. — OK (in order).
- n.i.O. — not OK: the window for creating a defect opens immediately (see below).
- n.z. — not applicable.
- n.p. — not checkable.
If a point has guidance, a Hint button sits under the question — tap it to read what to look for, tap again to hide the text. You can add a remark to every point. The All OK button in a section's header marks, after a confirmation, all still unanswered points of that section as i.O. — points already answered stay unchanged. The top of the form shows how many checkpoints are answered.
With Scan asset you can inspect a device by its QR code during the walkthrough; afterwards you continue with the walkthrough.
Create a defect
- Description (required).
- Severity — Critical, High, Medium or Low. The checkpoint's severity is suggested.
- Deadline — pre-filled from the severity: Critical +1 day, High +14 days, Medium +60 days. Low uses the known next date of the matching building schedule for a follow-up (including its correction), provided it is not in the past. Otherwise, choose a date yourself ("until the next walkthrough — please choose a date"). You can change the suggested date. A day in the past is not possible.
- Recommended action (optional).
- Responsible person — name and, optionally, email.
- Photos (before) — up to 5 photos; you can add more later on the defect's page.
Cancel leaves the checkpoint as it was. Recorded defects appear under the checkpoint; you can attach further photos there.
While the window is open, the app keeps the defect you started on the device. If the page reloads or the browser crashes, the app asks the next time you open the same walkthrough: Continue reopens the defect with its text and photos, Discard removes it. Photos larger than 4 MB are not kept — the app says so. The interim state is kept for 24 hours and removed when you sign out.
Create defect first saves the complete request with all selected photos locally. If this fails, the editor stays open. If the subsequent handover fails, the request survives a restart; Continue retries the unchanged request. A pending request does not expire after 24 hours. Cancel or Discard explicitly removes the scratch draft; the Back button alone does not. An unfinished defect in another walkthrough must first be continued or discarded there.
Complete
- Choose the overall assessment: Compliant, Minor defects, Significant defects or Immediate action required. "Compliant" cannot be chosen while open defects exist.
- Submit the walkthrough. All checkpoints must be answered, and building type, validity period and overall assessment must be chosen.
- If you are not marked as Brandschutzbeauftragter (e.g. as the owner), the app points this out; the protocol then carries a corresponding note.
- Sign — the walkthrough is then completed and the app returns to the building.
In between, saving the draft keeps your progress.
Without an internet connection
Prepare the building for offline work while online (see Offline mode). The app then also loads the checkpoint catalog, the building's walkthrough state and its open walkthrough drafts. Without a connection, answers, defects, photos and the completion with signature are stored on the device and sent at the next connection — the completion only after all of the walkthrough's defects have been sent. If sending fails, the walkthrough appears on the error page under Walkthroughs not uploaded.
Discard distinguishes between a draft that is still local and one already created on the server. For a server draft, only the pending completion is removed; its pending defects are kept. If the result of an earlier transfer is uncertain, it is checked online first. A confirmation opened before a login or workspace change no longer applies.
After completion
- Protocol: open the completed walkthrough under "Walkthroughs of this building" → Download PDF protocol (needs an internet connection). Alternatively, the PDF icon in the table Inspections → Completed Inspections downloads the protocol.
- Defects: they are listed in the Defects (walkthrough) tab. On a defect's page the owner and fire-safety officers change the status: Open → In progress → Resolved, forward only. "Resolved" requires a short remark (at least 10 characters) and is final — if the defect occurs again, create a new one. Status changes and "after" photos need an internet connection. After the signature a defect can no longer be deleted — close it as Resolved with a remark; deleting is only possible in the draft. The walkthrough shows for each defect when and by whom it was resolved, the remark, Before and After photos separately and its changes under History; a task for the walkthrough lists its defects under "Still to do" and "Resolved".
- Walkthrough state of the building: the Walkthroughs tab shows one card Periodic walkthrough (6 or 12 months) and one Monthly walkthrough with "Due on …", the last walkthrough and the state — Up to date, Due soon or Overdue. The next walkthrough is due at the end of the month 12, 6 or 1 month(s) after completion. As long as a building's state has not yet been determined, it reads "State unknown".
- Walkthrough required: administrators switch on per card whether a walkthrough is required for the building. A required but never walked building shows "Never carried out".